Today, Wed Nov 25Calgary Hitmen vs Red Deer Rebels 7:00 pm

Development

BMO Centre expansion: the $500 million project, what is inside and how it came together

Published November 23 2026

Rows of classic and custom cars on the BMO Centre exhibit floor in 2011, with visitors walking between them.
A car show inside the BMO Centre in February 2011, before the expansion.

Published November 23 2026.

The BMO Centre expansion opened on June 5 2024 on Stampede Park. According to the Calgary Stampede, the $500 million, 565,000-square-foot addition made the BMO Centre Western Canada’s largest convention centre, with more than one million square feet in total. The City of Calgary says it can host up to 33,000 guests. The Government of Canada, the Government of Alberta and The City of Calgary each paid an equal share, and Calgary Municipal Land Corporation (CMLC) was the development manager. The expansion replaced Hall A and the Stampede Corral.

BMO Centre expansion at a glance

ItemWhat the sources say
OpenedJune 5 2024 (City of Calgary)
Cost$500 million, funded in equal shares by the Government of Canada, the Government of Alberta and The City of Calgary through the Community Revitalization Levy (City of Calgary)
Size of the expansion565,000 square feet (City of Calgary; Calgary Stampede), on three levels (City of Calgary; CMLC)
Total sizeOver one million square feet (Calgary Stampede; City of Calgary)
Exhibition space addedMore than 100,000 square feet (City of Calgary)
Meeting rooms added38 (City of Calgary)
BallroomsTwo, totalling 70,000 square feet: the 50,000-square-foot Champions Ballroom and the 20,000-square-foot Percheron Ballroom (City of Calgary; CMLC)
Outdoor plaza100,000 square feet, open year-round (City of Calgary)
CapacityUp to 33,000 guests (City of Calgary)
DesignersStantec, Populous and S2 Architecture (Calgary Stampede; CMLC)
Development managerCalgary Municipal Land Corporation
NamingBMO renewed its naming rights for 10 years, through the end of 2033 (Calgary Stampede)

Checked November 23 2026 on the City of Calgary BMO Centre project page, the Calgary Stampede opening announcement and CMLC’s article on the building.

Before the expansion: the BMO Centre from 1982

The City of Calgary says the BMO Centre has been Calgary’s top venue for shows, events and conferences since 1982. It went through two major expansions, in 2000 and 2009, before this one. Before the latest work it had 285,000 square feet of rentable exhibition halls, meeting rooms and a ballroom. The new addition was connected to the existing building on Stampede Park, and the City says it replaced the aging parts of the existing facility, with Hall A and the Stampede Corral demolished.

The Corral, which opened in 1950, has its own page: our Stampede Corral history. The wider story of the grounds is on our Stampede Park history page.

Timeline from approval to opening

DateMilestoneSource
March 4 2019City council approved the financial strategy for four long-term projects, including the BMO Centre expansionCity of Calgary
March 12 2019Funding announced by the Government of CanadaCity of Calgary
Spring 2019Enabling works beganCity of Calgary
May 23 2019CMLC announced the project teamCity of Calgary
June 10 2020Architectural designs releasedCity of Calgary
July 2020Hall F completeCity of Calgary
April 29 2021Ground-breakingCity of Calgary
November 3 2022Structural steel completeCity of Calgary
March 13 2024Substantial completionCity of Calgary
May 22 2024Public art installation Spirit of Water completeCity of Calgary
June 5 2024Grand openingCity of Calgary

The Calgary Stampede’s opening announcement describes “decades of planning and four years of construction”. The City’s milestone list puts the start of enabling works in spring 2019 and the ground-breaking on April 29 2021.

What is inside the expansion

Exhibition halls, meeting rooms and ballrooms

The City lists more than 100,000 square feet of new exhibition space, 38 meeting rooms and two ballrooms totalling 70,000 square feet. CMLC describes the Champions Ballroom as 50,000 square feet of flexible, column-free space that can be set as a dining room for weddings or parties, theatre-style seating for speakers or an interactive classroom. It says the room is designed to evoke a rustic ranch barn and has a view of the Rockies to the west. The 20,000-square-foot Percheron Ballroom is named after the draft horses of the region’s agricultural history.

For the halls as visitors meet them, with hall letters, ballrooms and entrances, use our BMO Centre map and halls guide.

The Exchange, the Brand Room and the entrance

CMLC says the Exchange is a central gathering space anchored by what it calls Canada’s largest indoor fireplace and an Exchange Bar, designed to recall the warmth and company of a western campfire. The Brand Room is a private 11,000-square-foot outdoor patio overlooking Stampede Park, named in honour of the Calgary Stampede’s founders. At the entrance, CMLC says, the concierge desk sits beneath the neon cowboy, and Greg Newton, the Calgary Stampede’s Executive Vice-President, Conventions and Events and General Manager of the BMO Centre, describes it as a “hotel-level, old-school concierge experience”. CMLC also lists an 11,000-square-foot food service area for catering and a tasting kitchen.

The outdoor plaza and the art

The City describes the 100,000-square-foot plaza as a year-round gathering space for Calgarians and visitors to Stampede Park, including during the 10-day Stampede. The public art installation, Spirit of Water, was completed on May 22 2024, according to the City’s milestone list. The sources read do not describe the artwork.

Who paid and who ran the project

The City says the $500 million was equally funded by the Government of Canada, the Government of Alberta and The City, via the Community Revitalization Levy, which lets The City redirect part of the tax revenue created by redevelopment in a designated area. CMLC manages that levy. CMLC says the building is managed by the Calgary Stampede, and the City says CMLC served as development manager on behalf of the project partners, The City and the Calgary Stampede. The City reviewed designs at set intervals and had a regulatory role through the development permit.

Calgary Stampede CEO Joel Cowley thanked the three funding partners and CMLC at the opening, and the Stampede announced that BMO renewed its naming rights for 10 years as part of a partnership renewal through the end of 2033. In the same release, the Stampede traced the BMO and Calgary Exhibition relationship back to 1899, when BMO became the official bank of the Calgary Exhibition.

What the project was meant to bring

The City and the Calgary Stampede both say the economic impact to Calgary will be approximately $100 million a year, with thousands of jobs. The Stampede said at the opening that another 500 conventions and events were booked into the expansion, and that the first major event, the Global Energy Show, was loading into the halls for its June 11 event. These are projections and bookings stated in 2024. The pages read do not give a count of events actually held since.

A January 2019 Ernst & Young assessment, cited by the City, covers the full build-out of the Culture + Entertainment District rather than the BMO Centre alone. It says 4,750 full-time jobs could be created during construction and 1,536 permanent jobs once the new facilities open.

Where sources differ on size

The Stampede and the City both say the expansion is 565,000 square feet and that the building totals over one million square feet. The City also says the previous building had 285,000 square feet of rentable space and describes the expansion as doubling its rentable space. This site’s calculation: 285,000 plus 565,000 is 850,000 square feet, which is below one million. The sources do not explain the difference. It may reflect that “total space” counts areas that are not rentable, but neither source says so, and the page uses each figure as its source states it.

Visiting the BMO Centre now

The building is on Stampede Park, and the Calgary Stampede’s Getting to Stampede Park page says Victoria Park/Stampede Station is the fastest CTrain route to the BMO Centre, with Stampede Park lots for drivers and an 11th Avenue lot that the Stampede describes as a seven-minute walk from the BMO Centre. The December 2026 Market Collective market uses the building: see our Market Collective guide. What is on across the park is listed on What’s On at Victoria Park, and rooms near the park are covered on our hotels page.

Gaps in the sources

  • No source read gives the number of events held in the expansion since June 2024.
  • The City and Stampede total-size figures are not reconciled with the 285,000 square feet of earlier rentable space.
  • The 33,000-guest capacity is the City’s figure; the Stampede release read does not repeat it.
  • The Spirit of Water artwork is listed as a milestone but not described.

Sources

Share this page

Get the week at Victoria Park on Facebook and Instagram

Photos on this page are used under their licences and credited on our Photo credits page.